-
-
-
-
-
-
-
Electric Fails - Lighting
A simple job to test the lighting circuit as part of an EICR turned up this gem.
Gap filling taken to an extreme with the foam completely filling the light switch but nothing having changedexternally.
A short time after the EICR was finished the foam was chopped out circuit tested fully soon after.
-
Garden Outbuilding Upgrades
Upgrade to a make do and mend installation including many extensions and hardwired extension leads, and an extension to an adjacent toilet block.
The consumer unit required new connections to the MCBs as wire had been used in place of it.
The toilet block having fused control units to lights and the installed water heater.
-
Lounge Downlights Upgrade
A dull and uninspiring large lounge was transformed with contemporary downlighting solution.
We split the room into into 2 zones and dimmers were added to provide more control in each.
Reading was the focus in the area away from the window and relaxing with a little TV at the other.
Each was easily able to be catered for.